2015年3月28日托福考试写作范文

 3月最后一场托福考试已经落下帷幕,大家发挥得怎么样呢?出国留学网托福考试栏目与大家一同关注本次考试,并为大家整理了以下2015年3月28日托福考试写作范文,供大家参考!

  >>>欲知本次考试答案请点击:2015年3月28日托福考试真题及答案(汇总)

  独立写作题目:

  Do you agree or disagree with the statement: It is better to finish a project completely and then do another project than do two or more projects at the same time. 完成项目时,是一个接一个的做好,还是同时做两个以上的项目更好?

While we were taught from a young age that efficiency means multi-tasking, certain projects should be completed one at a time. Such practice ensures the quality of the final product and prevents from one having to redo certain parts of a long process. It also ensures the safety of those who will ultimately be the users of the final product.

A person has a limited attention span, and a sole stress of efficiency often results in a compromise of quality. In projects that are highly detailed and require a lot of careful attention, a person must devote his full attention to the task in order to not make any careless mistakes. Take, for example, a biology project involving the genetic engineering of a human cell line. A lot of initial planning is involved in selecting the right cells suitable for growing in a laboratory and capable of modification. The cells must then be carefully monitored in a controlled environment to keep them alive. The genes to be altered are analyzed before there are delivered in a viral vector to the desired cells. All of steps toward achieving the final product are laboriously planned out and executed. Any small mishaps along the way can easily force the scientist to start the process all over again and waste months of previous work.

Some projects are assigned with specific instructions for those involved to not take on any other projects. Such projects often involve products that will affect the safety of a large number of individuals. In the field of architectural design, a public structure to be used by thousands, even millions, of people every day will require that the initial project be carried out with care. The Tacoma Narrows Bridge was a public infrastructure completed in 1950 along the Puget Sound that was considered a monumental feat of engineering in its day. The twin suspension bridge, spanning 5,400 feet, took years of planning and construction by teams of architects, engineers, and construction workers. However, because the Department of Pacific Northwest Transportation was taking on several projects at the time and couldn’t simply focus on the bridge, the group of engineers failed to take the aerodynamics of the bridge into consideration during the design process. The gusts of wind along the Tacoma Narrows brought the structure to a collapse within months of the bridge’s opening, resulting in a catastrophe that is still remembered to this day as a classic example of failure of engineering.

As the two examples show, the projects of certain highly skilled professions require careful attention to detail and must be completed one at a time. Trying to couple several projects simultaneously will only result in one having to redo a lot of work due to careless errors or worse, a devastating loss of lives.

  >>>点击进入出国留学网托福考试栏目了解更多

  猜你可能喜欢:

  托福考试全攻略

  托福词汇表下载

  2015年托福考试预测(汇总)

  2015年托福考试真题及答案


分享

热门关注

​2021年6月5日托福考试真题汇总

托福考试真题

6月5日托福考试口语真题回顾一览

托福口语考试

6月5日托福考试阅读真题回顾一览

托福阅读考试

6月5日托福考试听力真题回顾一览

托福听力考试

2021年5月26托福考试真题汇总

托福考试真题

2021年2月28日托福考试真题答案

托福考试真题

2021年3月21日托福考试真题答案

托福考试真题

2021年5月26日托福考试写作部分真题

托福写作考试

6月5日托福考试写作真题回顾一览

托福写作考试

2021年3月托福考试真题答案(3月27日)

托福考试真题

热门问答